
LocTec Installation
| Leave the laminate
floor panels in the unopened pack for at least 24 hours or better still
48 hours at room temperature (18 degrees Celsius, 75% maximum humidity). A 0.2 mm thick sheet must be laid on all cement surfaces and ceramic tiles. Uneven screed surfaces must be leveled with suitable screeding compound. The laminate floor panels must always be laid floating for "normal" use on screeds (without bonding or adhesion to the surface.) |
Source: http://www.witex.com
|
|
|
|
|
|
|
|
For a detailed installation guide go to: